Tell us what you want built. You’ll see a price range now and a fixed price once your room is measured.
Bathroom
Shower conversions, refreshes, full remodels
Deck
Pressure-treated or composite
Kitchen
Design consult and custom quote
Something else
Tell us about it
Tub-to-Shower Conversion
The old tub comes out and a walk-in shower goes in, usually in four days.
4 days on site
Bathroom Refresh
New walls, vanity, toilet, lighting and floor, with the plumbing left where it is.
5 days on site
Safe Step Bath
A low-threshold shower, grab bars and a comfort-height toilet, so the bathroom stays easy to use as you get older.
Full Bath Remodel
We take the room down to the studs and rebuild it with a new layout, plumbing and finishes.
9 days on site
After this step you'll get a project code. Scan your room in the 4 Seasons app to lock in a fixed price.